14101887D Be it enacted by the General Assembly of Virginia: 1. That §§56-589 and 56-594 of the Code of Virginia are amended and reenacted as follows: §56-589. Municipal and state aggregation. A. Subject to the provisions of subdivision A 3 of §56-577, counties, cities, and towns (hereafter municipalities) and other political subdivisions of the Commonwealth may, at their election and upon authorization by majority votes of their governing bodies, aggregate electrical energy and demand requirements for the purpose of negotiating the purchase of electrical energy requirements from any licensed supplier within this Commonwealth, as follows: 1. Any municipality or other political subdivision of the Commonwealth may aggregate the electric energy load of residential, commercial, and industrial retail customers within its boundaries on an opt-in or opt-out basis. 2. Any municipality or other political subdivision of the Commonwealth may aggregate the electric energy load of its governmental buildings, facilities, and any other governmental operations requiring the consumption of electric energy. Aggregation pursuant to this subdivision shall not require licensure pursuant to §56-588. 3. Two or more municipalities or other political subdivisions within the Commonwealth may aggregate the electric energy load of their governmental buildings, facilities, and any other governmental operations requiring the consumption of electric energy. Aggregation pursuant to this subdivision shall not require licensure pursuant to §56-588 when such municipalities or other political subdivisions are acting jointly to negotiate or arrange for themselves agreements for their energy needs directly with licensed suppliers or aggregators. Nothing in this subsection shall prohibit the Commission's development and implementation of pilot programs for opt-in, opt-out, or any other type of municipal aggregation, as provided in §56-577. B. The Commonwealth, at its election, may aggregate the electric energy load of its governmental buildings, facilities, and any other government operations requiring the consumption of electric energy for the purpose of negotiating the purchase of electricity from any licensed supplier within the Commonwealth. Aggregation pursuant to this subsection shall not require licensure pursuant to §56-588. C. Nothing in this section shall preclude municipalities from aggregating the electric energy load of their governmental buildings, facilities, and any other governmental operations requiring the consumption of electric energy for the purpose of negotiating rates and terms, and conditions of service from the electric utility certificated by the Commission to serve the territory in which such buildings, facilities, and operations are located, provided, however, that no such electric energy load shall be aggregated for this purpose unless all such buildings, facilities, and operations to be aggregated are served by the same electric utility. D. Nothing in this section shall preclude municipalities from aggregating the electric energy load of their governmental buildings, facilities, and any other governmental operations requiring the consumption of electric energy for the purpose of net energy metering from a renewable energy generating facility that (i) uses as its sole energy source solar power, wind power, or aerobic or anaerobic digester gas and landfill gas; (ii) does not have an aggregate generation capacity of more than five megawatts unless a utility elects a higher capacity limit for such a facility; (iii) is located on land owned or controlled by the municipality; (iv) is interconnected and operated in parallel with an electric utility's transmission and distribution facilities; and (v) is used primarily to provide energy to metered accounts of the municipality. The aggregated municipal net metered accounts may be served by multiple meters that are located at separate contiguous or non-contiguous sites, such that the eligible municipality may aggregate in a single account the electricity consumption and generation measured by the meters, provided that the same electric utility serves all such meters. The electricity generated by the eligible municipal customer-generator's renewable electrical generation facility shall be allocated to each of the municipal net-metered accounts in proportion to the electrical load served by those meters and credited to kilowatt hours purchased. The aggregated load shall be served under the appropriate rate schedules. The terms of municipal net metering service shall be included in rates, terms, and conditions of service as provided in subsection C. §56-594. Net energy metering provisions. A. The Commission shall establish by regulation a program that 
 affords eligible customer-generators the opportunity to participate in net 
 energy metering, B. For the purpose of this section: "Eligible agricultural customer-generator" means a 
 customer that operates a renewable energy generating facility as part of an 
 agricultural business, which generating facility (i) uses as its sole energy 
 source solar power, wind power, or aerobic or anaerobic digester gas "Eligible multifamily net metering customer-generator" means a customer or customers that operate a renewable energy generating facility in a condominium, apartment complex, neighborhood, or homeowners association served by a common distribution circuit, which generating facility (i) uses as its total source of fuel renewable energy; (ii) does not have an aggregate generation capacity of more than 500 kilowatts; (iii) is located on land owned or controlled by the eligible condominium, apartment complex, neighborhood, or homeowners association or on customers' property within the condominium, apartment complex, neighborhood, or homeowners association; (iv) is interconnected and operated in parallel with an electric utility's transmission and distribution facilities; and (v) is used primarily to provide energy to metered accounts of the eligible multifamily net metering customer-generator. An eligible multifamily net metering customer-generator may be served by multiple meters that are located at separate sites within the site of the condominium, apartment complex, neighborhood, or homeowners association, such that the eligible multifamily net metering customer-generator may aggregate the electricity consumption and generation measured by the meters, provided that the same electric utility serves all such meters. The aggregated load shall be served under the appropriate tariff. "Eligible customer-generator" means a customer that 
 owns and operates, or contracts with other persons to own, operate, or both, an 
 electrical generating facility that (i) has a capacity of not more than 20 
 kilowatts for residential customers and 500 kilowatts for nonresidential 
 customers unless a utility elects a higher capacity limit for such a facility; 
 (ii) uses as its total source of fuel renewable energy, as defined in §56-576; 
 (iii) is located on the customer's premises and is connected to the customer's 
 wiring on the customer's side of its interconnection with the distributor; (iv) 
 is interconnected and operated in parallel with an electric "Net energy metering" means measuring the difference, over the net metering period, between (i) electricity supplied to an eligible customer-generator, eligible multifamily net metering customer-generator, or eligible agricultural customer-generator from the electric grid and (ii) the electricity generated and fed back to the electric grid by the eligible customer-generator, eligible multifamily net metering customer-generator, or eligible agricultural customer-generator. "Net metering period" means the 12-month period following the date of final interconnection of the eligible customer-generator's, eligible multifamily net metering customer-generator's, or eligible agricultural customer-generator's system with an electric service provider, and each 12-month period thereafter. C. The Commission's regulations shall ensure that the metering 
 equipment installed for net metering shall be capable of measuring the flow of 
 electricity in two directions. Such regulations shall allocate fairly the cost 
 of such equipment and any necessary interconnection. An eligible 
 customer-generator's electrical generating system, and each electrical 
 generating system of an eligible multifamily net 
 metering customer-generator or eligible agricultural customer-generator, 
 shall meet all applicable safety and performance standards established by the 
 National Electrical Code, the Institute of Electrical and Electronics 
 Engineers, and accredited testing laboratories such as Underwriters 
 Laboratories. Beyond the requirements set forth in this section, an eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator whose electrical generating system meets those standards and 
 rules shall bear the reasonable cost, if any, as determined by the Commission, 
 to D. The Commission shall establish minimum requirements for contracts to be entered into by the parties to net metering arrangements. Such requirements shall protect the eligible customer-generator, eligible multifamily net metering customer-generator, or eligible agricultural customer-generator against discrimination by virtue of its status as an eligible customer-generator, eligible multifamily net metering customer-generator, or eligible agricultural customer-generator, and permit customers that are served on time-of-use tariffs that have electricity supply demand charges contained within the electricity supply portion of the time-of-use tariffs to participate as an eligible customer-generator, eligible multifamily net metering customer-generator, or eligible agricultural customer-generator. Notwithstanding the cost allocation provisions of subsection C, eligible customer-generators, eligible multifamily net metering customer-generators, or eligible agricultural customer-generators served on demand charge-based time-of-use tariffs shall bear the incremental metering costs required to net meter such customers. E. If electricity generated by an eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural customer-generator 
 over the net metering period exceeds the electricity consumed by the eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator, the eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator shall be compensated for the excess electricity if the 
 entity contracting to receive such electric energy and the eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator enter into a power purchase agreement for such excess 
 electricity. Upon the written request of the eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator, the supplier that serves the eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator shall enter into a power purchase agreement with the requesting 
 eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator that is consistent with the minimum requirements for 
 contracts established by the Commission pursuant to subsection D. The power 
 purchase agreement shall obligate the supplier to purchase such excess 
 electricity at the rate that is provided for such purchases in a net metering 
 standard contract or tariff approved by the Commission, unless the parties 
 agree to a higher rate. The eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator owns any renewable energy certificates associated with its 
 electrical generating facility; however, at the time that the eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator enters into a power purchase agreement with its supplier, 
 the eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator shall have a one-time option to sell the renewable energy 
 certificates associated with such electrical generating facility to its 
 supplier and be compensated at an amount that is established by the Commission 
 to reflect the value of such renewable energy certificates. Nothing in this 
 section shall prevent the eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator and the supplier from voluntarily entering into an agreement 
 for the sale and purchase of excess electricity or renewable energy 
 certificates at mutually-agreed upon prices if the eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator does not exercise its option to sell its renewable energy 
 certificates to its supplier at Commission-approved prices at the time that the 
 eligible customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator enters into a power purchase agreement with its supplier. 
 All costs incurred by the supplier to purchase excess electricity and renewable 
 energy certificates from eligible customer-generators, eligible multifamily net 
 metering customer-generators, or eligible agricultural 
 customer-generators shall be recoverable through its Renewable Energy Portfolio 
 Standard (RPS) rate adjustment clause, if the supplier has a 
 Commission-approved RPS plan. If not, then all costs shall be recoverable 
 through the supplier's fuel adjustment clause. For purposes of this section, 
 "all costs" shall be defined as the rates paid to the eligible 
 customer-generator, eligible multifamily net 
 metering customer-generator, or eligible agricultural 
 customer-generator for the purchase of excess electricity and renewable energy 
 certificates and any administrative costs incurred to manage the eligible 
 customer-generator's, eligible multifamily net 
 metering customer-generator's, or eligible agricultural 
 customer-generator's power purchase arrangements. The net metering standard 
 contract or tariff shall be available to eligible customer-generators, eligible multifamily net 
 metering customer-generators, or eligible agricultural customer-generators 
 on a first-come, first-served basis in each electric distribution company's 
 Virginia service area until the rated generating capacity owned and operated by 
 eligible customer-generators, eligible multifamily net 
 metering customer-generators, or eligible agricultural 
 customer-generators in the F. Any residential eligible customer-generator or eligible 
 agricultural customer-generator  |